Fort Casey State Park

◄ Back
September 21, 2021 11:00 AM

Keystone boat launch breakwater repair

Construction is planned to begin in July 2022 to replace the breakwater structure and docks at the Keystone Boat Launch. Construction will last several months and will intermittently impact use of the boat launch. Specific details about temporary closures will be announced as construction contracting and scheduling is finalized in the spring.

Facebook Twitter Email