Sequim Bay State Park

◄ Back
January 17, 2017

Olympic Discovery Trail Bridge Installation - Park Impacts

Starting Monday, January 16, the Sequim Bay Lower Campground Loop and Boat launch Road will have limited access while construction material and equipment are staged for the Olympic Discovery Trail Bridge installation. Staging will require prolonged road closures. Crews will accommodate visitors when possible.

Those roads will be closed all day Tuesday, January 17th, while the bridge is maneuvered into position. Access to the lower loop and the boat launch will be closed that day.

The road is expected to open, at least with limited access, on Wednesday, January 19th.

The utility sites, 1-26 will be open through this period, January 16-18.

Questions about park operation during this period can be directed to park staff - (360) 683-4235

Facebook Twitter Google Plus Email